REQUEST A DEFENSIBILITY AUDIT
Get your consent documentation reviewed
Our team analyzes your FPIC documentation against tribunal precedents and identifies gaps before they become liabilities. Typical turnaround: 5 business days.
FPIC Consent Defensibility PackLithium Extraction Project — South America
Live demonstration of an immutable evidence assembly showing how consent documentation degrades over time — and where tribunals find gaps.
4D Temporal Evidence Sequence
Chronological reconstruction

Company declares: 'Operations remain in early preparatory phases; no material construction commenced.'
SATELLITE CONTRADICTION: Active pit excavation and infrastructure visible. Material change unannounced.
Risk Catalysts Identified
Where the record breaks
Automated analysis surfaced these consent defensibility risks. Each represents a potential point of failure in arbitration or regulatory review.
No contemporaneous record of community consultation meeting claimed in 2020 filing.
Q3 2021 investor disclosure contradicts satellite evidence of active construction.
Operations extended beyond permitted boundary into ancestral territory.
No documented FPIC process between initial engagement (T1) and permit grant (T2).
FPIC-PACK-2026-001
Complete chronological reconstruction ready for tribunal submission. All temporal states (T0–T4) collapsed into immutable exhibit format.
See where your consent record would break.
5-minute diagnostic. Immediate results. No commitment.